New condenser unit anchored down on a 4″ concrete pad.
Existing unit prior to the installation of new condenser.
Condenser after finalized installation.
Measuring
Condenser anchored down on 4 inch hurricane pad after complete and finalized installation of new Goodman equipment.
Prior air handler before the installation of the new equipment.
Air handler completely installed
Tampa HVAC Replacement